Testing&Commissioning in

From the most remote corners of the Earth comes the fuel that makes modern life possible.

Description

By providing comprehensive T&C services,including FTA,We ensures that the systems installed by the contractors are fully operational, reliable, and compliant with all requirements, thereby enhancing the contractors’ capabilities and reputation.

We deliver specialist services in the areas of:

Pre-Commissioning Checks:
Conduct thorough inspections and pre-commissioning tests to verify that all components are installed correctly and are ready for the final commissioning process.

Functional Testing:
Perform detailed functional tests to confirm that each part of the system operates as intended in both normal and emergency scenarios.

Load Testing:
Carry out load testing on generators and other equipment to ensure they can handle the expected operational load and to identify any potential issues under stress.

Integrated System Testing:
Test the integration of different systems, such as generators with automatic transfer switches and synchronization panels, to ensure seamless operation.

Performance Verification:
Verify that the entire system meets the performance criteria outlined in the project specifications and contract documents.

Safety and Compliance Testing:
Ensure that all systems comply with local and international safety standards, conducting tests like earth resistance and insulation resistance tests.

Documentation of Test Results:
Provide comprehensive documentation of all testing procedures and results, which is essential for future maintenance and warranty claims.

Factory Test Acceptance (FTA):
As the manufacturer, we ensure an exceptional FTA experience for the end user’s engineers. We meticulously prepare for their visit, ensuring the machinery is ready for thorough inspection and testing. Our team provides comprehensive support during the FTA, including technical assistance and detailed demonstrations, to facilitate a complete and transparent evaluation of the machinery. We are committed to making the FTA process informative, efficient, and satisfactory, reinforcing confidence in the quality and reliability of our products.

Client Training:
Train the contractor’s personnel and, if required, the end-user’s operational staff on the proper operation and maintenance of the systems installed.

Issue Resolution:
Address any issues discovered during testing promptly, providing solutions and making necessary adjustments or repairs.

Final Commissioning Report:
Prepare a detailed final commissioning report that includes all test results, adjustments made, and final acceptance of the systems by the contractor or end-user.

Post-Commissioning Support:
Offer post-commissioning support to handle any immediate operational issues and to assist with the transition to the operational phase.