When selecting a generator to run a 200-amp electrical service1, it’s essential to understand how to calculate the required generator size, as well as the impact of voltage, power factor2, and other key factors. Properly sizing the generator ensures that it can provide reliable power without overloading or causing damage to your equipment.
A 200-amp service requires a generator that can supply sufficient continuous power, considering both the running load and any surge demands.
Let’s dive into the steps for calculating the correct generator size and the factors that impact its capacity.
How do you calculate the correct generator size needed for a 200-amp electrical service?
The generator size needed for a 200-amp service depends on the voltage of the electrical system and the overall load of the facility or home. To determine the appropriate generator size, you need to calculate the total electrical load that will be running on the 200-amp service.
Step-by-step guide to calculate the generator size:
-
Determine the total wattage of the service:
The total wattage can be calculated using the formula:[
\text{Wattage} = \text{Amps} \times \text{Voltage}
]For a 200-amp service, assuming a 240V single-phase system, the total wattage is:
[
\text{Wattage} = 200 \, \text{amps} \times 240 \, \text{V} = 48,000 \, \text{watts} \, (\text{or 48 kW})
]This means a 48 kW generator is needed to provide continuous power for a 200-amp service.
-
Factor in the power factor:
Most electrical loads, especially inductive loads (such as motors or air conditioners), will have a power factor (PF) less than 1.0. The most common power factor for residential and commercial loads is 0.8.To adjust for the power factor, use the formula:
[
\text{KVA} = \frac{\text{Wattage}}{\text{Power Factor}}
]For a 0.8 power factor, the generator size required would be:
[
\text{KVA} = \frac{48,000 \, \text{watts}}{0.8} = 60 \, \text{kVA}
]This means a 60 kVA generator would be required to run a 200-amp electrical service with a power factor of 0.8.
Final Generator Size:
- For single-phase systems at 240V, the required generator size would be approximately 60 kVA.
- For three-phase systems, you would need a different calculation based on the system voltage (typically 480V) and the appropriate adjustment for the phase.
How does voltage and power factor affect the generator capacity for a 200-amp load?
Both voltage and power factor play significant roles in determining the appropriate generator size for a 200-amp service.
Impact of Voltage:
The voltage of the electrical system determines the amount of power (in watts or kilowatts) that can be delivered for a given current (amps). Higher voltage systems, like three-phase 480V, require less current for the same amount of power.
-
Single-phase 240V:
At 240V, the generator needs to be larger because the current required for the same load is higher. -
Three-phase 480V:
For three-phase systems with 480V, the power requirement is spread across three phases, which makes the generator sizing more efficient. The formula for three-phase systems is:[
\text{KVA} = \frac{\text{Amps} \times \text{Voltage} \times \sqrt{3}}{1000}
]For 200 amps at 480V, the generator size would be:
[
\text{KVA} = \frac{200 \times 480 \times \sqrt{3}}{1000} \approx 166 \, \text{kVA}
]This is a much larger generator than for a single-phase 240V system.
Impact of Power Factor:
The power factor (PF) indicates how efficiently electrical power is being used. Inductive loads (like motors, HVAC systems, etc.) typically have a lower power factor2 (usually around 0.8), while resistive loads (such as heating elements) have a power factor close to 1.0.
-
A lower power factor increases the apparent power (KVA) needed for the same amount of real power (kW). For example, if the power factor is 0.8, the generator needs to be sized at 1.25 times the real power (because ( \frac{1}{0.8} = 1.25 )) to account for the inefficiencies of the load.
-
If the power factor is close to 1.0 (as in the case with resistive loads like heaters or incandescent lighting), the generator size will be closer to the total kW requirement, and less apparent power will be needed.
Summary of Voltage and Power Factor Impact:
Voltage Type | Power Factor | Generator Size (for 200A service) |
---|---|---|
Single-Phase 240V | 0.8 | 60 kVA |
Three-Phase 480V | 0.8 | 166 kVA |
Single-Phase 240V | 1.0 | 48 kVA |
What are the key factors to consider when choosing a generator for a 200-amp residential or commercial service?
When selecting a generator to power a 200-amp service, several key factors must be considered to ensure efficient and reliable operation.

1. Load Type:
- Resistive Loads: If your 200-amp service is primarily powering resistive loads (such as lighting and heating), the generator size will be closer to the total wattage needed.
- Inductive Loads: If your service includes inductive loads (like motors, HVAC systems, and compressors), the generator must be sized to account for both surge and continuous power, which will require a larger generator to handle inrush currents.
2. Voltage and Phase Configuration:
- Single-phase systems (typically used in residential settings) require larger generators for the same load compared to three-phase systems, which are more commonly used in commercial or industrial settings due to their higher efficiency in distributing power.
- Ensure the generator matches the voltage and phase of your service for proper operation.
3. Power Factor:
- For systems with inductive loads, use a generator with enough capacity to handle a lower power factor (typically 0.8). This is especially important for systems with large motors or air conditioning units.
- For a higher power factor (close to 1.0), the generator can be smaller, as there is less waste in power delivery.
4. Starting Power (Surge Requirements):
- Many devices (especially motors and HVAC systems) have a large inrush current during startup. Make sure to account for this surge when sizing the generator to avoid overload.
- Soft starters or VFDs (Variable Frequency Drives) can help reduce the surge current for large motor-driven loads.
5. Generator Type (Fuel and Efficiency):
- Diesel generators are often more efficient for continuous heavy loads and last longer, but they come with higher upfront costs and fuel consumption.
- Gas generators are typically more affordable upfront and more suitable for intermittent or lighter loads, but they may be less fuel-efficient for heavy continuous use.
6. Future Expansion and Load Growth:
- When selecting a generator, consider not only the current needs but also potential future increases in load. It’s often wise to choose a generator with a 25% buffer above the estimated peak load to account for future expansion.
Conclusion
To run a 200-amp service, you typically need a 60 kVA generator for a single-phase 240V system, factoring in a power factor of 0.8. For three-phase systems, the generator size increases significantly. Properly considering the type of loads, surge requirements3, voltage, and power factor will ensure you select the right generator size for your residential or commercial service. Always allow a margin for future growth and load variations to ensure long-term reliability and efficiency.
-
Understanding 200-amp service is crucial for selecting the right generator size, ensuring efficiency and reliability in power supply. ↩
-
Power factor significantly affects generator capacity; learning more can help you choose the right generator for your needs. ↩ ↩
-
Surge requirements are critical for ensuring your generator can handle startup loads, preventing overload and damage. ↩