Online (GMT+8) Email
|
H&C Diesel Generator Manufacturer
Tanzania Moshi International Bus Terminal 1MW diesel generator EPS project
🏗️ Construction

Moshi International Bus Terminal 1MW EPS Generator

Moshi, Tanzania — 1 MW EPS Generator

📅 2019 🏭 Application: Public Infrastructure Standby Power 👤 Client: Moshi International Bus Terminal

Project Overview

The Moshi International Bus Terminal is a major public transport hub in northern Tanzania, where continuous power is essential for lighting, ticketing, security, and passenger information systems. The construction project specified a diesel generator for construction and operations standby that could keep the terminal functioning during frequent grid outages.

H&C supplied a 1 MW EPS generator built around a Perkins 4008TAG2 engine and Stamford alternator. The unit starts and transfers automatically on mains failure and has provided dependable standby power for the terminal since its commissioning in 2019.

Tanzania Moshi International Bus Terminal 1MW diesel generator EPS project

Key Specifications

Generator Model HC-P1250S
Rated Power 1 MW EPS Generator
Application Public Infrastructure Standby Power
Engine Perkins 4008TAG2
Alternator Stamford HCI544C
Controller Deep Sea DSE7320
Fuel Tank 2,000L Base Tank
Enclosure Weatherproof Canopy — ≤75 dBA @ 1m
Voltage / Frequency 400V / 50Hz

Need a Similar Project?

Tell us your power requirements — we'll design a generator solution that fits your application, budget, and local conditions.