🏗️ Construction
Zanzibar Social Security Fund 250KW EPS Generator
Zanzibar, Tanzania — 250 kW EPS Generator
📅 2018
🏭 Application: Government Building Standby Power
👤 Client: Zanzibar Social Security Fund (ZSSF)
Project Overview
The Zanzibar Social Security Fund required reliable standby power for its government office building to protect records, data systems, and daily administrative operations from grid outages. The 250 kW requirement reflected the building's essential load.
H&C supplied a 250 kW EPS generator built around a Perkins 1106A engine and Stamford alternator, configured for automatic start and transfer. Compact and quiet, the unit was installed on site and has provided dependable backup power since 2018.
Key Specifications
| Generator Model | HC-250GF |
| Rated Power | 250 kW EPS Generator |
| Application | Government Building Standby Power |
| Engine | Perkins 1106A-70TAG2 |
| Alternator | Stamford UCI274E |
| Controller | Deep Sea DSE6020 |
| Fuel Tank | 500L Base Tank |
| Enclosure | Weatherproof Canopy — ≤75 dBA @ 1m |
| Voltage / Frequency | 400V / 50Hz |
Need a Similar Project?
Tell us your power requirements — we'll design a generator solution that fits your application, budget, and local conditions.